PLM Phase 1 Project Plan
1 Introduction
1.1 Purpose of this document
This document is inteded to serve as the project plan for the first phase of the PLM implementation.
2 Project Life Cycle
2.1 Life Cycle Method
We will be using a SCRUM like method. More to follow here.
2.2 Phase Delverables
2.2.1 Requirements and Design Phase (aka "pre-game" phase )
| Document | Description | Owner | Delivery Date | Status |
| SRS (Software Requirements Specification) | Defines the software requirements for the project | Jonas Arndt | Review Draft Avaiable now | In Review |
| High Level Design | Includes Architectural description | Anil Sadineni | 1st draft Aug 18th | In progress |
| Use Cases | This document will provide details on the use cases that will be part of the Phase 1 implementation. | Jonas Arndt | Review Draft expected Aug 21st | In progress |
| Domain Model and class diagram | Description of the objects and how they interact with each other | Anil Sadineni | Review draft Aug 10th | Available for review |
| Detailed Design specification | This document will serve as the Internal reference Specification (IRS). It will document all internal interfaces needed to implement the Use Cases identified for the first implementation of PLM. We will assume the PLM specification will act as the External Reference Specification (ERS) | Jonas Arndt | ??? | In Progress. |
Last modified by scon, 08/13/09 16:30:36 (3 years ago)
